Snapshot
Location:
Clark County, Southeastern Idaho
Ownership:
100% owned
Size:
12,150 acres (49.2 km2)
Project stage:
Exploration and Development
Deposit Type:
Epithermal (gold)
Mineral Resource:
Independent Technical Report and Preliminary Economic Assessment, Kilgore Project, Clark County, Idaho, USA – August 2019
2018 Kilgore Project NI 43-101 Technical Report and Mineral Resource Estimate dated August 14, 2018
Resource Category | Tonnes (MM) | Grade Au (gpt) | Contained Ounces Au |
---|---|---|---|
Indicated | 44.6 | 0.58 | 825,000 |
Inferred | 9.4 | 0.45 | 136,000 |
Independent Technical Report and Mineral Resource Estimate for the Kilgore Project”, Clark Country Idaho, U.S.A., was prepared by Rowearth LLC. and Global Resource Engineering, Ltd and dated September 28, 2018 with an effective date as of August 14, 2018. David Rowe, CPG, of Rowearth LLC., is the Qualified Person that prepared or supervised preparation of the information in the Technical Report. Terre Lane with Global Resource Engineering, Ltd. Of Denver (“GRE”) is the QP for pit optimization and Todd Harvey, also of GRE, is the QP for metallurgical aspects. The report is available on SEDAR under the profile of Otis Gold Corp.
The PEA on the Kilgore Project was prepared by Global Resource Engineering. Ltd> (GRE) dated August 14, 2018, with an effective date as of March 31, 2019. David Rowe, Terre Lane, Jeffrey Todd Harvey and J.J. Brown are Qualified Persons under the Instrument. The report is available on SEDAR under the profile of Otis Gold.