Highlights

Highlights

  • Proven Production History: Mined and processed ~7.7 Moz silver, 123 Mlbs zinc, and 85 Mlbs lead between 2012 and 2018 under Buenaventura’s operation.
  • Fully-Permitted Mill Infrastructure: Includes a 600 tpd flotation plant, assay lab, core shed, tailings storage, and camp infrastructure.
  • Restart-Ready Asset: Infrastructure remains in place and well maintained, enabling near-term reactivation potential.
  • High-Grade Epithermal Vein System: Historically exploited narrow, high-grade silver-lead-zinc veins in a structurally controlled setting.
  • Regional Synergy: Proximal to Excellon’s Tres Cerros exploration project, providing shared infrastructure and development upside.

Email Signup

Sign up for the latest news and updates